Wednesday, June 4, 2014

Day 18: Shower Time

On our second to last day of work, everything progressed like normal on our site.  The pipe team was slowly getting bigger as they were installing the plumbing in multiple latrines and it was pretty awesome. The design was pretty simple but worked amazingly well.  The water was actually hot and everything worked perfectly.  It was amazing to see the finished product in action, even if I didn't get the chance to install one myself.  The whole day was spent either prepping for a roof or roofing, so that the pipe team could plumb as may as possible in the next day.  Capping off a productive day, Warner, Alex and I played a soccer game that night. Unfortunately we lost in sudden death overtime, but it was still a great game and I was still exhausted after it was over.